Solution

Replacing Excel with an internal tool, without stopping operations

Replacing Excel with an internal tool means moving a process that lives in shared spreadsheets into a web application with a database, validation, access profiles and change history. We uncover the rules hidden in the file, migrate the data with reconciliation and run both in parallel until the team trusts the new tool. A pilot takes 6 to 10 weeks; indicative price €20,000–60,000, plus VAT.

Replacing Excel with an internal tool is almost always a decision that comes late. The spreadsheet started as a simple list, kept growing, gained tabs, formulas, macros and colours with meanings, and today it supports a process that operations depend on. We design and build the application that replaces it: the same data in one place, with validation, access profiles, change history and the integrations the file never had.

The hidden cost of a process run in Excel

Excel is a good analysis tool. The problem starts when it becomes the system where the work happens. The symptoms are familiar:

  • Several versions. The file travels by email, someone works on a local copy and, at the end of the month, nobody knows which version is right.
  • Invisible rules. A broken formula or a row pasted in the wrong place changes a total without anyone noticing.
  • Dependence on one person. The macros were written by someone who has since moved to another role, and nobody else touches them.
  • No history. There is no reliable way to know who changed a value, when and why.
  • Coarse permissions. Anyone who opens the file sees everything, including data that has nothing to do with them.

The direct cost is the time spent consolidating, checking and correcting. Example: if four people spend six hours a week combining and checking sheets, that is twenty-four hours a week. The indirect cost is the risk: a decision taken on the basis of a wrong number. The calculator on the pricing page helps you estimate your own case.

Signs this is your case

  • There is a file that, if it became corrupted tomorrow, would bring a team to a halt.
  • The file has an informal “owner”, and people ask that person to make changes.
  • Data is copied from the ERP into Excel and then back into the ERP.
  • You need to know who approved what, and you cannot.
  • People outside the team receive the whole file when they should only see part of it.
  • The file is slow to open or locks up when two people edit it.

What we build

An internal web application, accessed in the browser, designed around the process rather than around the file. As a rule, it includes:

  • A database with a clear data model, instead of tabs and columns.
  • Forms with validation that will not save incomplete or inconsistent data.
  • Statuses, owners and deadlines, so that every record has someone responsible and a stage.
  • Access profiles, so that each person sees and changes only what concerns them, with SSO where it makes sense.
  • Change history: who changed what, when, and what the previous value was.
  • Lists, filters and export to Excel, for those who need to analyse the data.
  • Integrations with the ERP, the CRM or Microsoft 365, when the data comes from there or has to go back.

How it works, step by step

  1. Survey of the file and the process. We open the file with the people who use it. We record the formulas, the macros, the manual checks and the conventions that exist only in people’s heads, such as “red means it needs reviewing”.
  2. Data model and rules. We turn tabs and columns into entities, relationships and explicit rules. This is where the contradictions the file was hiding come to light.
  3. Iterative build. We show working versions to the team that will use the application and adjust them based on real use, not on assumptions.
  4. Migration with reconciliation. We import the data, deal with duplicates and confirm that totals and counts match the original file.
  5. Parallel running. The team uses the application while the file remains available for comparison.
  6. Switching off the file. On an agreed date, the file becomes a reference archive and the application becomes the only source.

What we define before we start

  • Systems and data: which data comes from the file, which comes from the ERP or other systems, and what the source of each will be from go-live onwards.
  • Access profiles: who consults, who edits, who approves and who administers.
  • Logging: which changes are kept in the history and who can consult it.
  • Exceptions: what happens to records that fail validation during migration, and to cases the current process resolves “by hand”.
  • Documentation: data model, business rules and a short manual for the team, delivered alongside the code.

Indicative timeline and price

Prices are indicative and VAT is added. More detail on the pricing page.

  • Process diagnostic: 2 weeks. Process map, current cost, proposed solution and a fixed price. €3,000–6,000, deducted from the project if you go ahead. In this case, it includes a detailed reading of the file and its rules.
  • Pilot in production: 6–10 weeks. A tool, automation or integration working with real users. €20,000–60,000. The pilot replaces the file in one specific process, with migration and a period of parallel running.
  • Ongoing evolution: support and improvements. €2,000–6,000 a month. New features, adjustments and moving other files into the same application.

When we are not the right choice

  • When the file is used by one or two people, the risk is low and Excel still does the job. In that case, it is not worth changing.
  • When an off-the-shelf product or a low-code platform already covers the process well. We recommend that route.
  • When replacing an ERP or another core system without defined processes, migration and operational ownership.
  • When the project requires dozens of developers at the same time, or 24/7 operations with contractual service levels.

Further reading

If the file mainly exists to produce indicators, see operational reporting and audit trail. If the data is copied to and from the ERP or the CRM, see ERP–CRM integration. The coordinating commercial operations project describes an internal tool with a shared task queue and a log of actions. Our articles (in Portuguese) on replacing a critical Excel file without stopping operations and low-code or bespoke development go into the migration and the choice of route in more detail.

Frequently asked questions

Will we lose the ability to work in Excel?

Not necessarily. The application becomes the source of the data, but it can export lists and reports to Excel for analysis. What stops happening is several people editing different copies of the same file as if each were the official version.

How is the data currently in the spreadsheets migrated?

We import the existing data, clean up duplicates and inconsistent values, and carry out a reconciliation: totals and counts in the application have to match those in the file. Records that fail the new validation rules go onto a review list instead of being discarded.

How long do Excel and the application run in parallel?

Long enough for the team to compare results and trust the application, usually at least one full cycle of the process, such as a month-end close. The date for switching off the file is agreed with the team, and the file is archived for reference only.

Why not use a low-code platform?

For some processes, a low-code platform is enough and costs less. It makes less sense when there are complex business rules, integration with the ERP, audit trail requirements or many users with different profiles. We assess this in the diagnostic and tell you which case you are in.

Does the application work with the Microsoft accounts we already have?

Yes, when the organisation uses Microsoft 365. Authentication can use SSO with Microsoft Entra ID, and access profiles can follow the groups that already exist. People who leave the organisation lose access when their account is disabled.

Tell us about the process you want to improve.

We reply by email with our reading of the problem and the next step that makes sense.

Discuss a project